The Springs at Westport Club

A Maintenance Free Community Starting in The Mid $400's

Welcome to the Springs of Westport Club, an age-targeted community designed to cater to every whim of today’s active adult lifestyle.  The Springs is located within the boundaries of the Westport Club planned community.

Nestled near the banks of Lake Norman, you may spend your mornings fishing or playing golf on our 18 Hole Championship course. Spend the afternoon by the Jr. Olympic pool, or in the twenty-four hour fitness center. You may even decide to play a few sets of tennis on one of our eight state of the art clay courts. After a hectic day of golfing, tennis and slaving by the pool, you can walk home to your immaculate new home.

A custom home that has been constructed beyond today’s typical new construction building standards. A home to show off to your friends. Brick, Stone, and hardy exteriors give way to rich hardwoods, heavy moldings, granite countertops, custom tile baths and laundries, high-end appliance and lighting packages. A truly custom home for your enjoyment. You may be downsizing, but we understand you don’t need to downsize the quality.

Maintenance Free Patio Homes

But wait there’s more. Your home will be built “accessible”. Every home will be designed with wider hallways and doors, as well as open master baths, closets, and laundries.

Your kitchen will be designed with the future in mind. Microwaves and wall ovens will be positioned at countertop levels. Large wide open showers are available for your convenience. and much more.

No More Maintenance – you’re free to travel, play with your grandkids, play more golf, and really enjoy life!

Enjoy a Maintenance-Free Lifestyle!

Richly Appointed Kitchen

Light and Airy

Restful Retreat

Master Spa

Soaring Ceilings

Outdoor Living

Beautiful Models and Floor Plans

Mimosa

Nickerson

Firethorne Holly

Apollo

Mimosa

4 Bedroom

3 Bath

Office/Dining - Loft

2900 Sq Ft

$569,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Full Front Porch
  • Walk-in Attic
  • Two Car Garage
  • Private Courtyard

Mimosa - Floor Plans

Firethorne Holly

3 Bedroom

2 Bath

Flex for Office/Dining

2000 Sq Ft

$509,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Full Front Porch
  • Architectural Shingles
  • Two Car Garage
  • Private Courtyard

Firethorne Holly - Floor Plans

Gardenia

4 Bedroom

3 Bath

Office/Dining - Loft

2900 Sq Ft

$569,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Single Story Plan Available
  • Bedroom / Hobby Room
  • Two Car Garage
  • Private Courtyard

Gardenia - Floor Plans

Indian Hawthorne

2 Bedroom

2 Bath

Double Master

1800 Sq Ft

$479,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Full Front Porch
  • Walk-in Attic
  • Two Car Garage
  • Private Courtyard

Indian Hawthorne - Floor Plan

Honeysuckle

2 Bedroom

2 Bath

Double Master

1800 Sq Ft

$479,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Full Front Porch
  • Architectural Shingles
  • Two Car Garage
  • Private Courtyard

Honeysuckle - Floor Plan

Nickerson

3 Bedroom

2 Bath

Vaulted Ceiling

1600 Sq Ft

$459,950

  • Granite Countertops
  • Stainless Appliances
  • Wood Flooring
  • Walk-in Master Shower
  • Single Story Plan Available
  • Bedroom / Hobby Room
  • Two Car Garage
  • Private Courtyard

Nickerson - Floor Plan

Built to Exceptional Construction Standards

Interior Features

Exterior Features

  • Wide Hallways and Wide Doorways for easy Accessibility
  • Lever Door Handles and Paddle Light Switches for Easy Accessibility
  • Trim: Beautifully Trimmed with 2 pc Crown
  • Vaulted Great Room
  • Vaulted or Trey Ceiling Master Bedroom
  • Nine Foot Height Ceilings, except where Vaulted and Trey
  • Natural Gas Fireplace with Hearth
  • Stone Fireplace Surround
  • Granite and Quartz Countertops
  • True Sand and Finish Hardwoods
  • Tile floors Bathrooms and Laundry
  • Tile Showers
  • Tile Backsplash in Kitchen
  • Walk-In / Roll In Double Master Shower
  • Selection of Cabinets and Finishes constructed from Solid Wood
  • Tankless Natural Gas Water Heater, Endless Supply…
  • GE Profiled Appliance Packages
  • Vented Hood over cooktop
  • Sherwin Williams Paint
  • Flexibility in design: Optional Bedroom/Office/Dining area
  • Custom Lighting Package
  • Ceiling Fans and Lights in all Bedrooms
  • Delta Windemere Plumbing Fixtures
  • Finished and Trimmed Garage
  • Under Cabinet Lighting
  • Custom Closet System in Master Bath
  • 14 SEER Trane HVAC Units
  • Security Prewire
  • Maintenance Free Landscape and Exterior (HOA)
  • Private Side Courtyards for outdoor enjoyment and entertaining
  • All Queen Size Brick and Stone Exteriors
  • 30 Year Architectural Shingles
  • Anderson Casement Windows
  • Basements and Tall Crawl Workshops depending on lot selection
  • Security Floodlights
  • All Gutters in Buried Downspouts
  • Irrigation System

Personalize Your Home

Available Options

  • Pot Filler Over Cooktop
  • Central Vacuum
  • Basement or Tall Crawl Workshop
  • Skylights
  • Hardwoods in Bedrooms
  • Surround Sound
  • Video Security
  • Thermostat and Blower in Fireplace
  • Heated Tile Floors
  • Screened In Side Porch
  • Mantel Over Fireplace or Fireplace Surround
  • Laundry or Garage Utility Sink
  • Outdoor Gas Drop for Grill or Fire Pit

Tom Daniel, Manager
Westport Lakeside Development, LLC
Phone:  (336) 255-1498
Fax:  (336) 274-1746
Email:  tdaniel@lifeatwestport.com

Brad Baranowski, Realtor
Elle Bee Realty & Associates
Phone:  (704) 534-0952

Email: brad@ellebeerealty.com

Tom Daniel, Manager
Westport Lakeside Development, LLC
Phone:  (336) 255-1498
Fax:  (336) 274-1746
Email:  tdaniel@lifeatwestport.com

Brad Baranowski, Realtor
Elle Bee Realty & Associates
Phone:  (704) 534-0952

Email: brad@ellebeerealty.com